Our Broadbridge Primary School project recently featured in the Northern Builder Magazine.
The school also benefited from a number of green technologies, including an underfloor heating system controlled remotely in an effort to keep energy waste to a minimum and a water infiltration system which allows for surface water to soak back into the ground through permeable asphalt surface; this system negates the need for sloping surfaces to drain away water, helping reduce the potential of flooding and reducing drainage costs.
For the complete article, click on the link below –
The project saw the delivery of 10 new classrooms, a sports hall, refurbishment of the existing school building, decanting of the existing mobiles, associated site works, street lighting site services, drainage and remodeling of the existing car park and front entrance.
The school also benefited from a number of green technologies, including an underfloor heating system controlled remotely in an effort to keep energy waste to a minimum and a water infiltration system which allows for surface water to soak back into the ground through permeable asphalt surface; this system negates the need for sloping surfaces to drain away water, helping reduce the potential of flooding and reducing drainage costs.
For the complete article, click on the link below –
[/et_pb_text][/et_pb_column][/et_pb_row][/et_pb_section]