Works are continuing onsite at our extensive refurbishment project at The Berkeley Hotel.
Relocation and refurbishment to a number of back of house facilities such as the pastry kitchen, laundry room, connecting corridors and staff restaurants have now been completed with resin flooring spanning throughout the hotel’s footprint on basement level.
Additional basement works included tanking and structural works to fuse the old and new hotel including pinning and propping. A brand-new power supply has also been installed.
Works are also continuing to all different room typologies spanning from 1st floor level through to the 8th floor penthouse with 1st and 2nd fix now complete.
Piperhill are set to thrive in London’s luxury hospitality industry for the remainder of 2021, whilst adding to it’s glowing reputation within both residential and commercial sectors; including various luxury bars and restaurants, youth centres and multi million pound residences.
We pride ourselves in being qualified and experienced to undertake all aspects of work; from new build, basement construction and interior fit out, through to fully integrated services and first class designer finishes.
Whether working within design and build or traditional contracts, our unfailing aim is to satisfy all of our clients and their consultants requirements, and to produce the highest quality finished project.
Please feel free to contact us on 0208 166 5607 if you wish to discuss a project.